Skip to main content

A concrete footing or pier base is measured with a yellow tape measure showing about 31…

A concrete footing or pier base is measured with a yellow tape measure showing about 31 inches across its top, with a wooden post stub and debris nearby on muddy ground.

Collection

Pass Christian Residential Damage

Original title

DSCN0215.JPG

Citation

“A concrete footing or pier base is measured with a yellow tape measure showing about 31…,” Hurricane Digital Memory Bank, accessed November 3, 2026, https://hurricanearchive.org/items/show/4896.